Area Aptitude MCQ

In this section we will be solving Numerical ability and Aptitude Multiple choice questions on Area. It will include Rectangle, Circle, Quadrilateral, Trapezium, Rhombus etc.

Q 1 – The area of a rectangular field is 2100 Sq meters. If the field is 60 meters long, what is its perimeter ?
  • 180 m
  • 190 m
  • 200 m
  • 210 m

Q 2 – The length of a rectangle is 18 cm, and its breadth is 10 cm. If the length is increased to 25 cm. what should be the breadth of the rectangle if Area remains the same ?
  • 7 cm
  • 7.1 cm
  • 7.2 cm
  • 7.3 cm

Q 3 – The radius of a circle is so increased that its circumference increased by 5%. Find the percentage increase in its area ?
  • 8 %
  • 9.75 %
  • 10 %
  • 10.25 %

Q 4 – The length of a rectangular plot is thrice its breadth. If the area of the rectangular plot is 7803 sq metres, what is the breadth of plot ?
  • 51 m
  • 88 m
  • 104 m
  • 153 m

Q 5 – A room is 30 metres long and 18 metres wide. If a carpet whose width is 2 metres and which costs Rs 50 per metre is spread on the floor of the room, what will be the total cost ?
  • Rs 11275
  • Rs 12745
  • Rs 13500
  • Rs 12275

Q 6 – A room 5.49 metres long and 3.87 metres broad is to be paved with square tiles. Find the edge of the longest tile which will exactly fit ?
  • 9 cm
  • 16 cm
  • 23 cm
  • 26 cm

Q 7 – In a row there are 25 houses, each house has 17 windows, each window has 4 panes and each pane measures 1.5 dm by .75 dm. What is the cost of glazing all these windows at Rs 6 per meter square ?
  • Rs 98.35
  • Rs 102.20
  • Rs 108.15
  • Rs 114.75

Q 8 – The area of four walls of a room is 660 m² and length is twice the breadth, the height being 11 m. Find the area of the ceiling ?
  • 164 m²
  • 196 m²
  • 200 m²
  • 212 m²

Q 9 – Jay can finish a piece of work in 16 days. Robin can complete the same piece of work in 8 days. If both of them work together, then in how many days can they finish same piece of work ?
  • 4 2/5 days
  • 5 1/3 days
  • 6 days
  • 12 days

Q 10 – Jay can finish a piece of work in 16 days. Robin can complete the same piece of work in 8 days. If both of them work together, then in how many days can they finish same piece of work ?
  • 4 2/5 days
  • 5 1/3 days
  • 6 days
  • 12 days

Q 11 – Jay can finish a piece of work in 16 days. Robin can complete the same piece of work in 8 days. If both of them work together, then in how many days can they finish same piece of work ?
  • 4 2/5 days
  • 5 1/3 days
  • 6 days
  • 12 days

Q 12 – Jay can finish a piece of work in 16 days. Robin can complete the same piece of work in 8 days. If both of them work together, then in how many days can they finish same piece of work ?
  • 4 2/5 days
  • 5 1/3 days
  • 6 days
  • 12 days

Q 13 – Jay can finish a piece of work in 16 days. Robin can complete the same piece of work in 8 days. If both of them work together, then in how many days can they finish same piece of work ?
  • 4 2/5 days
  • 5 1/3 days
  • 6 days
  • 12 days

Q 14 – Jay can finish a piece of work in 16 days. Robin can complete the same piece of work in 8 days. If both of them work together, then in how many days can they finish same piece of work ?
  • 4 2/5 days
  • 5 1/3 days
  • 6 days
  • 12 days

Q 15- Jay can finish a piece of work in 16 days. Robin can complete the same piece of work in 8 days. If both of them work together, then in how many days can they finish same piece of work ?
  • 4 2/5 days
  • 5 1/3 days
  • 6 days
  • 12 days

Leave a Reply

Your email address will not be published. Required fields are marked *